I'm a little backed up with pics so here's a couple from last week.
With the basic pedal configuration set up,
I was able to sheet out the last bit of permanent floor on the drivers side.
The plan is to have the front part removeable,
in case the pedal assembly needs to be taken out.
In that first pic you can see an L frame out of thicker steel.
That will need to be drilled and tapped to match that aluminum base plate.
Also there will be an angled foot plate so it's like a normal car.
Yeah nothings easy.
The weakest part of my planning
was I didn't complete the clutch or brake linkages first.
So now they have to be done from underneath.
Grrr...
TP
creeping |
With the basic pedal configuration set up,
I was able to sheet out the last bit of permanent floor on the drivers side.
The plan is to have the front part removeable,
in case the pedal assembly needs to be taken out.
almost done |
In that first pic you can see an L frame out of thicker steel.
That will need to be drilled and tapped to match that aluminum base plate.
Also there will be an angled foot plate so it's like a normal car.
Yeah nothings easy.
front floor |
The weakest part of my planning
was I didn't complete the clutch or brake linkages first.
So now they have to be done from underneath.
Grrr...
TP
No comments:
Post a Comment